Civil Engineering (or Civils for short) works are undertaken by combining our plant and labour resources with our in-house knowledge and experience and then, as the final ingredient, adding our specialist suppliers. This work may be a stand- alone contract or combined with any, or all, of our key disciplines, Demolition, Excavation, Bulk Excavation, Remediation and Recycling Soils and Aggregates.

All projects offer their own set of problems – working in close proximity to live services, working close to residential areas, keeping water courses clean, phased hand overs for the clients on-going works. Manchester based O’Gara always look for ways to overcome such occurrences, making the projects run smoothly and offering a prompt and effective client handover.

Civil Engineering projects are a diverse group, it can take the scope of new concrete yards in dockland environments; new car parks and infrastructure to National Trust properties; re-profiling existing ground levels, and the excavation and re-shaping of railway embankments to allow for the construction of railway infrastructure.

From a bill of quantities or a set of working drawings, we are able to price the specified scheme, either in a selective tender or sealed bid process. O’Gara also commit to Value Engineering to assist the Main Contractor where our experience may offer an opportunity.

Our Civil Engineering works can be divided into three clearly defined sectors:

We are able to offer tracked excavators and tipper lorries on a 24/7 basis and so meet the demands of night working on key areas of the Highway Network. This is backed up by being licenced to open our Waste Transfer Station for the same hours and so offer imported fill to projects around the clock, whilst also being able to dispose of site arisings whether inert, non-hazardous or hazardous.

Our knowledge of working within restricted traffic management environments has enabled us to work effectively on the M6, M56 and M62 undertaking, but not limited to, central reservation and hard shoulder upgrades, removal of safety crash barrier and the installation of new drainage and concrete aprons.

We have also been involved with the construction of accessways and car parks requiring sustainable underground drainage (SUDS), swales and balancing ponds to deal with surface water drainage.

We have experience in enabling works to set up a project’s compound, form accessways and transport routes for specialist rail plant and machinery.

We have experience in pile mat construction, together with ‘cut and fill’ and ground re-profiling for Network Rail’s ongoing new asset delivery.

Our demolition of old and outdated assets together with the inclusion of new construction enabling works offers a fast track approach to having the new build undertaken and reduces contractor interfaces.

Whether the works are being undertaken within a possession, a blockade or a night-time activity, we have the infrastructure to meet the client requirements and demands.

Our flexible and versatile approach to work with the Main Contractor and to best suit his requirements has resulted in our airside works to include demolition and site clearance, together with concrete apron removal and crushing.